After Simon RWA Systeme GmbH has delivered the Louvre windows for the velodrome of the Olympic Summer Games in London in 2012 now the hole control system was ordered as well. So Simon RWA is responsible for a major part of the technical building fire protection. The systems will be used as smoke ventilation but also used for natural ventilation of the stadium. A big vote of confidence by the client in our reliable technology!